GCA Audit Readiness

This page prepares the exact scope and evidence package for a future independent audit. No third-party audit has been completed, and this page must not be used as an auditor opinion.

Network Base Mainnet / 8453
Contract 0x3197c42f4a06f7be32a9a742ac2a766f0ff682c6
Audit Status No completed third-party audit
Source BaseScan verified
Compiler v0.8.24 / optimizer 200
Scope File token/contracts/GCAToken.sol

Scope Boundary

This package is audit preparation only. It is not a completed third-party audit, not an auditor opinion, not a security-vendor approval, not a listing approval, and not a claim that market-structure risks are solved.

Contract Scope

Source filetoken/contracts/GCAToken.sol
Standard JSON inputverification/GCAToken.standard-json-input.json
NetworkBase Mainnet / chainId 8453
Contract0x3197c42f4a06f7be32a9a742ac2a766f0ff682c6

Review Checklist

  • Verified source matches deployed bytecode.
  • Fixed supply cannot change after deployment.
  • No owner, admin, proxy, upgrade, mint, blacklist, pause, transfer-tax, hidden-fee, custody, or withdrawal path exists.
  • Transfers, allowances, and ERC-20 events behave as expected.

Internal Technical Report

technical-report.html summarizes current contract controls for triage. It is not an independent audit.

Token Safety

token-safety.html lists positive controls and pending external-review items.

Blockaid Follow-up

blockaid-followup.html documents the current response to volatility, LP lock, concentration, and audit-status questions.

Auditor Handoff Template

Please review the GCA fixed-supply ERC-20 contract and deployed bytecode on Base Mainnet. The goal is to confirm that the verified source matches deployed bytecode, the total supply is fixed, and no hidden privileged control, minting, withdrawal, blacklist, tax, or upgrade behavior exists.

Expected Deliverables

  • Auditor name and report date.
  • Final report URL or signed PDF.
  • Reviewed source bundle or commit hash.
  • Unresolved findings, if any.
  • Clear statement that the review is independent.

Readable Auditor Intake Path

Use the readable technical report, token safety checklist, Blockaid follow-up, risk remediation, and custody roadmap pages for auditor intake and reviewer handoff. These references are preparation artifacts and do not represent a completed third-party audit.

Do Not Overstate